high quality stone mining machines

costing of cum m concrete

State Institute of Vocational Education Andhra Pradesh

cum cum cum cum cum cum cum sqm Units of payment Per%cum Per%cum Per%cum percum percum percum percum persqm MEASUREMENT OF MATERIALS AND WORKS Chapter 2. 5 Estimation and Costing 6. Cement concrete bed 7. R.C. Sunshade (Specified Width & Hight Damp ProofCource (D.P.C) (Thickness should be men-tioned) Brick work: 1. Brickwork in foundation 2

rcc design for m25 of 1 cum schievelavabojourdan.be

Costing Of Cum M Concrete mayukhportfolio COST OF 1 CU.M OF M20 GRADE CONCRETE. To make 10 cum of concrete, we must take a total volume of 15.2 cum

SUB-ESTIMATE NO : 04 Sewage Collection System and

Lift 1.5 to 3.0 m Cum 1 0.785 1714.0 1.5 2019 230 464420 Lift 3.0 to 4.5 m Cum 1 0.785 1747.2 1.5 2058 255 524898 Lift 4.5 to 6.0 m Cum 1 0.785 1780.8 1.5 2098 279 585344

Steel quantity by thumb rule GeekInterview

Civil Engineering Steel quantity by thumb rule How can we get the steel quantity by thumb rule ? I know that it is 1% for slab and 2-3% for RCC column & beams. If I have 10 Cum RCC work for column & beam then how can we get the steel quantity in kgm or Qntl.?. 55 Answers are available for this question.

ESTIMATING, COSTING AND VALUATION .xyz

Appendix IV : Contains Approximate Maximum Quantity of Steel Required per cum of Concrete for different R.C.C. items. Appendix V : Contains typical project of a residential building. ESTIMATING, COSTING AND VALUATION DETAILED CONTENTS PART I : ELEMENTS Of ESTIMATING AND COSTING Chapter 1 APPROXIMATE METHODS Of COSTING 1-1. General 1-2

cost of 1 cubic meter of m20 concrete in india BINQ Mining

May 05, 2013· BINQ Mining > Mining News > cost of 1 cubic meter of m20 concrete in india; Print. Concrete Mix Design Dr. M. C. Nataraja Professor of Civil cum from this you calculate weight of cement in kg(1 Cum = 1440 kg)

4.9/5(2.2K)

Why Precast Costs Less National Precast Concrete Association

Why Precast Costs Less. Instead, for precast concrete products, the focus should be on the Total Cost of Ownership (TCO). How is TCO calculated? The Total Cost of Ownership is equal to the sum of the four cost components: quality, service, delivery and price. what is the cost for 1 cum of precast concrete. Reply. Sara Geer says. October

Looking for ready mix concrete in Surrey and London

Looking for ready mix concrete in Surrey and London Calculate how much concrete you need with our free, easy to use concrete volume calculator.

Reinforcement Estimates YourSpreadsheets

Reinforcement Estimates Typical average weight of reinforcement (kg/m3) in concrete building elements. The below figures are for guideline only and may vary for different projects.

100 TOP ESTIMATING and COSTING Multiple Choice Questions

ESTIMATING and COSTING Multiple Choice Questions :-Q No: 01 The rate of payment is made for 100 cu m (per % cu m) in case of. A. Earth work in excavation

Concrete Recycling In Findlay, Ohio mayukhportfolio

The Shelly Company: Limestone, Concrete and Asphalt Paving. More than 96 limestone, sand and gravel, ready mix and asphalt facilities statewide, The Shelly Company has

M-30 Mix Designs as per IS-10262-2009

Tags: concrete, concrete mix design, Concrete technology, grade of concrete and ratio pdf, IS-10262-2009-CONCRETE MIX DESIGN INDIAN STANDARD METHOD, M-30 Mix Designs as per IS-10262-2009, m30 concrete compressive strength, m30 concrete means, m30 grade concrete mix design, m30 grade concrete mix ratio, m30 mix design with fly ash, Mix

How to Calculate Quantities of Cement, Sand and Happho

The sand requirement is in Kgs (for every cum of concrete) and not Kgs/cum. While the density unit is Kgs/cum. So the resultant value i.e., when weight/density will be in cum.

Worked Out P&M Costing (Without Formula) | Concrete

Per Cum Total Cost Including DI Per Cum Owning Cost Per Month Plant Hours Concrete Pump BP-1800 Concrete Pump Capacity per Hour Total qty required Pump Concrete Total Concrete pump hours Total Concrete pump per Concrete Pump . Documents Similar To Worked Out P&M Costing (Without Formula) Initial Review. Uploaded by. Jonathon Backus

Estimate FOR THE SEPTIC TANK tropmet.res

Cum; Same as above, but filling with contractor's locally available filling Providing and casting in situ cement concrete of M 25grade concrete of trap metal as per detailed designs including dewatering, centering formwork with shuttering ply & steel plates, compacting with

ESTIMATION AND COSTING | CIVIL ENGINEERING

civil_engineering The estimation of building quantities like earth work, foundation concrete, brickwork in plinth and super structure etc., can be workout by any of following two methods: a) Long wall

how to calculate costing for concrete per cm sodetal.eu

How to Figure Concrete Yardage: 14 Steps (with Pictures, how to calculate costing for concrete per cm,Feb 17, 2017·,32;How to Figure Concrete Yardage, If you have more than one prism in your concrete pour, calculate each one''s volume, Concrete weighs about 4000 pounds per .A New Highway Is To Be Constructed Design A Calls,Answer to A new highway is to be constructed Design A calls for a

What is the cost of concrete per m3 in india? Quora

·

cost of concrete depend upon the strength required. it will vary roughly from 3500 to 6000 depending upon the requirement or nature of job like PCC work or RCC work, in RCC the strength of concrete required as M25,M30,etc.

Guidelines for preparing the civil cost estimates of

GUIDELINES FOR PREPARING THE CIVIL COST ESTIMATE OF TRANSMISSION SYSTEM PROJECT The following shall be considered while preparing the cost estimate of Transmission System Project: Concrete (cum) Reinforcement (MT) R.C.C. P.C.C. M.S./TOR Per tower Total Per tower Total Per tower Total Per Tower Total Dry

costing on rmc plant in accounting incam2017

costing on rmc plant in accounting. Costing of the Production and Delivery of ReadyMixConcrete. activities in readymixed concrete (RMC) plants. RMC refers to accounting is rapidly disappearing. for only 10% of the cost, whereas material accounts for.

How to Calculate Cement, Sand and Aggregate required for 1

So care should be taken while calculating the amount of Cement, Sand and Aggregate required for 1 Cubic meter of Concrete. Method-1: DLBD method to determine material requirement for 1 Cum concrete The DLBD (Dry Loose Bulk Densities) method is an accurate method to calculate cement, sand and aggregate for a given nominal mix concrete.

how we calculate of Sand, cement and aggregate of M20

·

how we calculate of Sand, cement and aggregate of M20 ratio or other ratio? Once the W/C ratio is determined use 186 kg water (for 20mm CA) to find out the qty. of cement per cum of concrete

Specifications for RCC Construction | Building Estimating

#The RCC (Reinforced Cement Concrete) band is as wide as the thickness of wall and 75 mm to 100 mm thick and constructed using M 15(1:2:4) cement concrete. #Provide two bars 10 mm in diameter at its mid thickness along with 6mm diameter link @ the rate of

plz give me the rate of RCC(1cuM), PCC(1 cuM), Brick Work

plz give me the rate of RCC(1cuM), PCC(1 cuM), Brick Work (1sqM)? upon the grade of concrete. If PCC is M10 (1:3:6) and if it RMC (Ready Mix Concrete) cost will be about 3500 Rupees per Cum and RCC of M20 or 25 cost may not differ much may be around 4250 more or

Civil Engineering Estimating and Costing Aptitude

8. A cement concrete road is 1000 m long, 8 m wide and 15 cm thick over the sub-base of 10 cm thick gravel. The box cutting in road crust is